Professional career · 1970 — 2025

More than five decades leading large-scale projects.

From industrial cost estimating to the direction of hydroelectric plants and the supervision of major projects in Latin America — an entire career in critical works.

2023 — 2025

APCA-Vielca / Concremat Consortium

Project Manager

Guatemala

  • New Chiquimula Public Hospital — preparation, planning and construction. Capacity of 214 beds (189 census + 25 non-census), with ICU and 5 operating rooms.
  • Overall coordination of the supervision — technical, contractual and financial control; monitoring of the civil, electrical, hydro-sanitary and mechanical installations and of the hospital equipment.
  • Hospital hydro-sanitary system — potable-water supply (dedicated well, cistern and distribution networks), wastewater networks conveyed to the wastewater treatment plant (WWTP) and independent stormwater drainage.
HospitalHydro-sanitary installationsPublic worksProject management
2018 — 2022

TEMEC

Commercial Representative

Colombia

  • Supply of steel equipment (formwork and falsework) for infrastructure projects.
  • Clients in Bogotá, such as OHL and Mota-Engil.
FormworkFalseworkCommercial
2013 — 2016

Equitesa

Technical Superintendent

Ecuador

  • Chone Multipurpose Project (Manabí) — Río Grande dam and flood-control, irrigation and water-supply works; technical management and site superintendence.
  • Diversion/discharge tunnel of the Río Grande dam, 4.0 m in diameter and 230 m long.
  • Irrigation network in GRP pipes from 1,800 mm to 2,200 mm in diameter; potable-water subsystems with an 800 mm transmission main and urban PVC distribution networks with house connections.
Flood controlIrrigationPotable waterSuperintendence
2011 — 2013

Hidrotoapi EP

Supervision Manager

Ecuador

  • Toachi-Pilatón Hydroelectric Project: Pilatón-Sarapullo (49 MW) and Toachi-Alluriquín (204 MW) developments.
  • Review of studies, final designs and bidding documents.
  • Review of the designs for the intake structures (bocatomas), the desanders and the headrace hydraulic circuit — tunnels, surge chambers and penstocks.
  • Review of the hydrology and sediment-transport studies that underpinned the sizing of the developments.
SupervisionWater resourcesTunnelsBidding
2007 — 2010

LEMECAN / Hidrolitoral

Supervision Director / Manager

Ecuador

  • Baba Multipurpose Project — flood control, irrigation, water supply and hydropower generation (42 MW; 161 GWh/year), with 4 dikes, 1 “duckbill” spillway, 3 relief gates and 1 power plant.
  • Direction and technical supervision of the dam works, the water-transfer system — a water-transfer tunnel 7 to 8 m in diameter diverting the Baba River to the Daule-Peripa reservoir — the power generation works and the hydraulic infrastructure.
  • Supervision of the construction of canals, galleries and pipelines from 1.2 m to 5 m in diameter (GRP on the secondary lines), with intake and discharge structures.
  • Supervision of drainage, hydraulic sanitation, flood control and erosion protection.
  • Approval of drawings, measurements, technical reports and construction procedures; quality, schedule and cost control.
  • Coordination between the client, designers and contractors; health and safety, environmental and risk management; participation in the handover and commissioning of the works.
SupervisionWater resourcesFlood controlIrrigation
2000 — 2004

ENGITUBO

Partner / Technical Manager

Portugal

  • Falsework and scaffolding on bridges, viaducts and buildings (Porto, Lisbon, Coimbra, Leiria, Algarve).
  • More than 5 million m³ of falsework executed.
FalseworkBridge structures
1995 — 2000

Soares da Costa / Bento Pedroso Consortium

Technical Director

Portugal · Client: EDP / JAE

  • Touvedo HPP (22 MW): concrete dam with an open-air powerhouse downstream — intake, headrace circuit and return of the turbined water to the river.
  • Temporary river diversion and cofferdams; spillway (flood-discharge structure) and hydraulic safety works; foundation treatment with a grout curtain and drainage for seepage and uplift control.
  • Access viaduct to the Coimbra Bridge-Weir — a weir regulating the Mondego River — and to IP3/IC2/IC3: 23,200 m² deck, 1.4 km, 100 piers.
ViaductsTechnical directionHydroelectricWater resources
1990 — 2000

Soares da Costa

Site Director

Portugal

  • Bridge over the Cétos: 1,440 linear m, clear spans of 300 and 120 m on prestressed curves.
  • Road infrastructure works and large-scale prestressed structures.
  • Road drainage systems — surface and deep drainage devices, collectors and hydraulic crossings — and slope erosion protection on the road works.
BridgesPrestressedDrainageInfrastructure
1988 — 1990

ENGIL S.A.

Site Director — Hydraulic Circuit

Portugal · Client: EDP

  • Alto Lindoso hydroelectric plant (630 MW): power plant, underground tunnels, ventilation galleries, valve chamber and the discharge channel returning the turbined water to the river.
  • Continuous drainage and pumping of groundwater inflows from the rock mass in the underground excavations — powerhouse, tunnels and galleries.
  • Surface drainage systems — ditches, culverts and crossings — on the 655 km of roads built and upgraded for the project.
  • 23.2 million m³ of excavation and 1.25 million m³ of concrete; around 1,500 workers mobilized.
Site directionTunnelsHydroelectric
1982 — 1987

Construtora Mendes Junior

Production Manager · Production Dept. Coordinator

Brazil and Iraq

  • São Paulo Subway — Jabaquara, Santa Cecília and Terminal Tietê stations (Green and Yellow lines).
  • Groundwater lowering in the excavations and relocation of the public water and sewer networks at the station areas — the line excavations, at depth, ran below the existing networks.
  • Galeão International Airport — runway expansion, apron, administrative building and control tower.
  • Channeling of the Arrudas River (35 km) — urban macro-drainage and flood control in Belo Horizonte.
  • Expansion of the USIMINAS steel mill — civil works in an industrial plant, including drainage of industrial yards and areas.
  • Railway works in Brazil and Iraq (A3 level) — platform drainage with ditches, culverts and minor drainage structures, and erosion protection on cuts and embankments.
SubwayAirportUrban drainageRailwaysSteelmaking
1976 — 1982

CEMIG — Centrais Elétricas de Minas Gerais

Manager / Engineer

Minas Gerais · Brazil

  • Construction of the Volta Grande (380 MW), Jaguara (424 MW) and São Simão (1,710 MW) hydroelectric projects.
  • Works requiring river diversion with cofferdams and diversion structures so the dams could be built in the dry.
  • Execution of the hydraulic structures — spillway, intake and headrace circuit — on the large concrete-pouring fronts.
  • Works with large volumes of concrete, steel, formwork, falsework and excavation in rock and soil.
Hydroelectric plantsDamsPower sector
1970 — 1976

APIA Construção S.A.

Cost Estimator

Belo Horizonte · Brazil

  • Technical cost estimates for industrial projects — USIMINAS and AÇOMINAS.
  • More than 200 cost estimates prepared, including large-scale housing developments with their urban infrastructure — potable-water networks, sanitary sewerage and stormwater drainage.
  • Execution control of the expansion of USIMINAS units II and III.
Cost estimatingSteelmakingHousing